A realistic design of the CBM-TOF wall based on modules commissioned in-beam

  1. Wang, J.
  2. Wang, Y.
  3. Gonzalez-Diaz, D.
  4. Chen, H.
  5. Fan, X.
  6. Li, Y.
  7. Cheng, J.
Revista:
Journal of Instrumentation

ISSN: 1748-0221

Ano de publicación: 2012

Volume: 7

Número: 10

Tipo: Artigo

DOI: 10.1088/1748-0221/7/10/P10004 GOOGLE SCHOLAR